gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone verifying Phase 2 context gathered 2026-06-07T10:13:21.244Z 2026-06-06 -- Phase 1 fully verified; media storage switched from R2 to Supabase Storage; avatar CDN display confirmed working
total_phases completed_phases total_plans completed_plans percent
7 1 4 5 14

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-05)

Core value: Pets are first-class social identities — not just content on a human's feed — so every feature is built around the pet's life, not the owner's. Current focus: Phase 2 — Content Core (next)

Current Position

Phase: 1 (Foundation) — COMPLETE Plan: 4 of 4 complete Status: All Phase 1 success criteria met; walking skeleton verified end-to-end Last activity: 2026-06-06 -- Phase 1 fully verified; media storage switched from R2 to Supabase Storage; avatar CDN display confirmed working

Progress: [██░░░░░░░░] 7%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
- - - -

Recent Trend:

  • Last 5 plans: -
  • Trend: -

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Phase 1: Pet-as-actor identity (active_pet_id in JWT) must be established before any other phase; cannot retrofit
  • Phase 1: All media via presigned R2 upload — never route binary through API server
  • Phase 2: Stories is a separate DB table (not posts with expires_at) — decided before content model is built
  • Phase 2: Feed uses Redis fan-out-on-write sorted sets from day one — no naive SQL join feed
  • Phase 2: Block/report (SAFE-01, SAFE-02) ships in Phase 2 before any public content access

Pending Todos

None yet.

Blockers/Concerns

  • Verify Clerk @clerk/nextjs compatibility with Next.js 15 App Router before starting Phase 1
  • Confirm tRPC v11 is stable on npm before adopting (fall back to v10 if still beta)
  • Confirm Tailwind CSS v4 upgrade path from create-next-app scaffold before starting Phase 1
  • Verify Mux current pricing model before committing to Phase 5
  • Confirm Supabase Realtime supports private 1:1 channel subscriptions before designing Phase 6 DM real-time layer

Deferred Items

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-06-06T10:17:45.376Z Stopped at: Phase 2 context gathered Resume file: .planning/phases/02-content-core/02-CONTEXT.md