- hashtag-helpers.ts: extractHashtags (regex+dedup) + saveHashtags (upsert) - parse-caption.ts: parseCaption → CaptionSegment[] for client rendering - search.byHashtag GREEN: hashtag.findUnique → postHashtag.findMany + pagination - posts.create + reposts.create: extract+save hashtags after post creation - /hashtag/[tag]: infinite scroll post grid + useInView sentinel - /search Tags tab: byHashtag query wired, 3-col post grid - PostCard: parseCaption replaces raw caption — hashtags are orange Link to /hashtag/[tag] - STATE.md: Phase 3 complete, 3/7 phases done Tests: 67 passing, 0 failing (5 todo), tsc clean Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
3.2 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | executing | Phase 3 complete (6/6) | 2026-06-13T00:00:00.000Z | 2026-06-13 -- Phase 3 complete; 67 tests passing; ready for Phase 4 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-06-05)
Core value: Pets are first-class social identities — not just content on a human's feed — so every feature is built around the pet's life, not the owner's. Current focus: Phase 3 — Engagement and Discovery
Current Position
Phase: 3 (Engagement and Discovery) — COMPLETE Next: Phase 4 — Pet Profiles & Discovery Status: Phase 3 all 6 plans done; 67 tests passing
Progress: [█████░░░░░] 57%
Phase 2 — Completed 2026-06-13
All 6 plans complete:
- 02-01: Schema + stubs (Prisma, Redis, router stubs, test scaffolds)
- 02-02: Social graph (follow/unfollow, block, report)
- 02-03: Redis fan-out feed, /feed page, nav
- 02-04: Photo posts (carousel, PostCard, creation flow)
- 02-05: Stories (24h, PawRing SVG, StoryTray, StoryViewer)
- 02-06: Milestone posts (MilestoneCard, ProfileTabs)
Test suite: 50 passing, 1 pre-existing failure (media-upload.test.ts — missing Supabase URL in test env).
TypeScript: clean (npx tsc --noEmit exits 0).
Gitea backup: pushed (master, commit 273d412).
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: -
- Total execution time: 0 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Recent Trend:
- Last 5 plans: -
- Trend: -
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Phase 1: Pet-as-actor identity (active_pet_id in JWT) must be established before any other phase; cannot retrofit
- Phase 1: All media via presigned R2 upload — never route binary through API server
- Phase 2: Stories is a separate DB table (not posts with expires_at) — decided before content model is built
- Phase 2: Feed uses Redis fan-out-on-write sorted sets from day one — no naive SQL join feed
- Phase 2: Block/report (SAFE-01, SAFE-02) ships in Phase 2 before any public content access
Pending Todos
None yet.
Blockers/Concerns
- Verify Clerk @clerk/nextjs compatibility with Next.js 15 App Router before starting Phase 1
- Confirm tRPC v11 is stable on npm before adopting (fall back to v10 if still beta)
- Confirm Tailwind CSS v4 upgrade path from create-next-app scaffold before starting Phase 1
- Verify Mux current pricing model before committing to Phase 5
- Confirm Supabase Realtime supports private 1:1 channel subscriptions before designing Phase 6 DM real-time layer
Deferred Items
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none) |
Session Continuity
Last session: 2026-06-06T10:17:45.376Z Stopped at: Phase 2 context gathered Resume file: .planning/phases/02-content-core/02-CONTEXT.md