adminandClaude Sonnet 4.6 847ac97bde feat(03-06): Hashtag search end-to-end — Phase 3 complete
- hashtag-helpers.ts: extractHashtags (regex+dedup) + saveHashtags (upsert)
- parse-caption.ts: parseCaption → CaptionSegment[] for client rendering
- search.byHashtag GREEN: hashtag.findUnique → postHashtag.findMany + pagination
- posts.create + reposts.create: extract+save hashtags after post creation
- /hashtag/[tag]: infinite scroll post grid + useInView sentinel
- /search Tags tab: byHashtag query wired, 3-col post grid
- PostCard: parseCaption replaces raw caption — hashtags are orange Link to /hashtag/[tag]
- STATE.md: Phase 3 complete, 3/7 phases done

Tests: 67 passing, 0 failing (5 todo), tsc clean

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-13 12:16:03 +02:00

3.2 KiB

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone executing Phase 3 complete (6/6) 2026-06-13T00:00:00.000Z 2026-06-13 -- Phase 3 complete; 67 tests passing; ready for Phase 4
total_phases completed_phases total_plans completed_plans percent
7 3 16 16 57

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-05)

Core value: Pets are first-class social identities — not just content on a human's feed — so every feature is built around the pet's life, not the owner's. Current focus: Phase 3 — Engagement and Discovery

Current Position

Phase: 3 (Engagement and Discovery) — COMPLETE Next: Phase 4 — Pet Profiles & Discovery Status: Phase 3 all 6 plans done; 67 tests passing

Progress: [█████░░░░░] 57%

Phase 2 — Completed 2026-06-13

All 6 plans complete:

  • 02-01: Schema + stubs (Prisma, Redis, router stubs, test scaffolds)
  • 02-02: Social graph (follow/unfollow, block, report)
  • 02-03: Redis fan-out feed, /feed page, nav
  • 02-04: Photo posts (carousel, PostCard, creation flow)
  • 02-05: Stories (24h, PawRing SVG, StoryTray, StoryViewer)
  • 02-06: Milestone posts (MilestoneCard, ProfileTabs)

Test suite: 50 passing, 1 pre-existing failure (media-upload.test.ts — missing Supabase URL in test env). TypeScript: clean (npx tsc --noEmit exits 0). Gitea backup: pushed (master, commit 273d412).

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
- - - -

Recent Trend:

  • Last 5 plans: -
  • Trend: -

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Phase 1: Pet-as-actor identity (active_pet_id in JWT) must be established before any other phase; cannot retrofit
  • Phase 1: All media via presigned R2 upload — never route binary through API server
  • Phase 2: Stories is a separate DB table (not posts with expires_at) — decided before content model is built
  • Phase 2: Feed uses Redis fan-out-on-write sorted sets from day one — no naive SQL join feed
  • Phase 2: Block/report (SAFE-01, SAFE-02) ships in Phase 2 before any public content access

Pending Todos

None yet.

Blockers/Concerns

  • Verify Clerk @clerk/nextjs compatibility with Next.js 15 App Router before starting Phase 1
  • Confirm tRPC v11 is stable on npm before adopting (fall back to v10 if still beta)
  • Confirm Tailwind CSS v4 upgrade path from create-next-app scaffold before starting Phase 1
  • Verify Mux current pricing model before committing to Phase 5
  • Confirm Supabase Realtime supports private 1:1 channel subscriptions before designing Phase 6 DM real-time layer

Deferred Items

Category Item Status Deferred At
(none)

Session Continuity